http://mojo25.platelayer.com/jakobs-creek-work-in-progress.aspx

PlateLayer by Svein-Martin Holt (25)

 

Jakobs Creek Work in progress

05/11/2016 Categories: Jakobs Creek RR

It take some time to finish this part of the layout, but now some plaster is added between some of the rockpieces. I need to mold some more rocks also. Still a lot of blue styrofoam that should be covered.

One more bridge is installed. Still missing some support for the bridges. Check out the images.